
New TopShim run:

version = topshim 2.0.0
date = 2024-03-04
time = 18:57:21.146
command = topshim 

FINE SHIMMING

Parameters:

probe = Z108618_0624
solvent = CDCl3
shim nucleus = 2H
nucleus optimised for = 13C
o1p (from lock) = 7.24 ppm

Results:


1D Shimming:
Iteration  1: FWHM Before= 1.6 Hz, Target= 0.6 Hz, After= 0.9 Hz
Iteration  2: FWHM Before= 0.9 Hz, Target= 0.7 Hz, After= 1.6 Hz
Iteration  3: FWHM Before= 1.6 Hz, Target= 1.5 Hz, After= 2.1 Hz
Iteration  4: FWHM Before= 2.1 Hz, Target= 1.3 Hz, After= 2.0 Hz
Iteration  5: FWHM Before= 2.0 Hz, Target= 0.3 Hz, After= 1.6 Hz
Iteration  6: FWHM Before= 1.6 Hz, Target= 0.8 Hz, After= 1.2 Hz
Shim succeeded

Lineshape quality factor (1D spectrum, spinning) = 1.37

shim changes: 
Z	-26
Z2	-187
Z3	-1016
Z4	+408
Z5	+3689

duration = 3 min 41 sec
completed successfully
finished Mon Mar  4 19:01:01 2024


========================================================================
